Hot-air Welder TOP-3400CHot-air Welder TOP-3400CHot-air Welder TOP-3400CHot-air Welder TOP-3400C
Hot-air Welder TOP-3400CHot-air Welder TOP-3400CHot-air Welder TOP-3400CHot-air Welder TOP-3400C

Hot-air Welder TOP-3400C Hot-air Welder & Jointer & Guns

Specification:

Power: 3600W

Heating element: Original imported heating wire

Laser: Laser positioning line

Handrail: Yes       Led light: Yes      Anti-wind device: Optional

Auto-dormancy: Yes, protect heating element, longer lifespan

Temperature control: Digital temperature control, digital display, temperature float ±1℃

Scope: Banner, tent, tarpaulin and waterproof materials etc

MOQ: 1set

Features

  • We focus on welding advertising materials for ten years and develop several series hot air welding machines. This is one of our top end machines with high quality. Designed professionally for PVC、PE、TPO ECB、CSPE、EPDM and so on.

    Due to stable functions and strong power, its effect is resistant to severe weather such as  typhoon and low temperature for long time. Besides high speed improves work efficiency. The splicing effect is resistant to severe weather such as southern typhoon and northern low temperature.

    WeR  Company

    F
    Features

    1. Small size, light weight and easy to carry

    2. Digital display function makes temperature more clearly.

    3. The wind is strong,and wind is adjustable to satisfy various requirements.

    4. Welding speed is fast, time saving. The wind mouth is wider, the stitching is more firm.

    5. Handrail helps to move and regulate direction conveniently.

    6. Universal wheels, easy to move.

    7. Laser precision positioning system strengthens accuracy.

    8. Equipped with LED light, convenient for night lighting.

    9. The machine has a landing gear, which makes the movement more flexible and labor-saving.

    WeR  Company

    H
    How to use
    • 01
      Connect  to AC220V, turn on power button

      Power button

      WeR  Company

    • 02
      Make the cloth for seaming flat and tight

      Make the cloth for seaming flat and tight, take joiner to accurate (about 2-4cm), Fix both ends by tape or glue on ground.

      WeR  Company

    • 03
      Set the temperature and walking speed

      Connect the power supply, set the temperature and walking speed according to the thickness of the cloth. Temperature and speed is adjustable. As shown:

      WeR  Company Temperature Knob  WeR  Company Speed Knob

    • 04
      Turning the heating switch

      Turning the heating switch (yellow knob), the machine starts to heat up. Wait for 2 minutes,when actual temperature (PV) approach desire temperature (SV), we can start weld.

      WeR  Company Heating Switch  WeR  Company Temperature Display

    • 05
      Welding Positioning

      Welding positioning. Lap welding pressure (working wheels)- wheel edge must be aligned with the upper edge of the banner, but also aligned with the guide wheel on the side edge of the banner. As below:

      WeR  Company

    • 06
      Lifting The Handle

      Lifting the handle, making the working wheel on ground, as the show.

      WeR  Company

    • 07
      Start Welding:

      Pulling the heat gun to position handle and making the nozzle close to ground then move the nozzle to left so that it can be place a right position, at that time, the welding will work automatic.

      WeR  Company

    • 08
      During Welding

      During welding, let hot air nozzle between two overlap pieces. And be make sure hot air nozzle and Rubber wheel walk in straight line. If not, please adjust by handrail. Check photo:

      WeR  Company

    • 09
      Finishing Welding

      When we finish these work, pull the handle shake, turn right to move out nozzle until stops rotating nozzle upwards and it is locks.

    • 10
      Turn Off The Switch

      When finished, turn off the yellow knob,shut off main power supply when the PV value is less than 50 degree.then we can turn off the poTrend.

    N
    Note

    For first-time users, you can get a piece of scrap cloth to measure the temperature of the required , test methods are as follows:

    Making quickly the cloth next to the nozzle, if there is a burning cloth, it shows the temperature at this time is possible. the effect of welding should be as follows:

    WeR  Company

     

    N
    Notice

    1. During operating, if the surface cloth is dissolved and scorched or the cloth are not stuck together, please stop to adjust the temperature or speed.

    2. During operating,if the seaming part is not in right position, please stop to adjust fixing position.

    3. During operating, make sure clothes are flat so that stick together smoothly.

    4. The hot wind of heater cannot touch the press-wheel or the rubber of press-wheel is easy to be burned down.

    5 Adjust temperature to zero before turn off the heater. Switch off after 5-10 minutes.

    6.Take care the nozzle.Use brush to clean if there is dust or block in the nozzle or filter.

     

    G
    General instruction for safety

    Warning: The basic principal of safe protection should be followed to reduce the danger of fire in disaster, electric shock and personal harm. Please pay attention to the following items carefully before operation.

    1. Keep the working place clean. Messing up and the disorderly working place cause disaster.

    2. Choose the work place carefully and use the machine in a bright and dry circumstance.

    3. The electricity, controlling box and protective facilities have to be in the proper order after finishing daily work. The electrical power supply has to be switched off definitely.

    4. The machine has to be stopped before gets maintenance or replacing the parts.

    5. Use standard or indicated tools when dismantling or replacing parts.

    6. For safety and the long life of the machine, please do not let the machine operates overtime.

    7. If any special incidents happened, please stop the machine first for repairing, And do not deal with the special incident with improper procedures.

    8. If the machine is operated on land, keep the work place clean and no dust there. If dust or something blocks the inhaling filter of heater, the heating wind can not come cut adequately and then temperature inside of filter will rise to let the heater burn down.

     

    M
    Moving, Dismantlement, Installation, Cleaning

    1. Any part of this machine being bumped of fallen can cause some damage impossible to be repaired.So please pay attention to carry it. It is suggested to move the machine by manpower and put it down carefully.

    2. Please check if there is damage or missed parts after unpack the machine. Any problem, please contact us or the local agent immediately.

    3. The place for installation must be flat and the floor is strong enough to support the machine and moreover, the installation place should close to power supply.

    4. Keep the installation place no dust and avoiding sunshine.

    5. Please sweep away the anti-rust oil from the machine with detergent and re-lubricate with light lubricating oil after installation.

    WeR  Company

Technical Parameters

Voltage 230V
Power 3600W, 50-60HZ
Temperature 700℃
Speed 0-15m/min
Welding width 3-4.5cm
Thickness  0.2-3mm
Certification CE

 

More Info

Inquiry

If you have any questions, feedback or comments, please fill out the form below and we will reply you back as soon as possible.